It is still dusty and gray. Between construction site grilles and Kaimauer, it becomes tight when cyclists and walkers pass the remaining strip on the banks of the Danube Canal. By summer, the redesign of this central section between Salztor and Marienbrücke on the side of the first district should be finished. Then there should be more green at 300 meters, seating and a separate bike and foot traffic.