NOS NOS “totally operational and situation is stabilized”

by Andrea
0 comments
NOS NOS "totally operational and situation is stabilized"

A us has announced that your network is fully operational and stabilized after Monday’s blackout. The teams worked at night to reconfigure the network and ensure the full functioning of the services.

The operator informed us on Tuesday that its network is “totally operational and the situation is stabilized”, after the .

“The teams of us worked at night to ensure the network reconfigurations necessary for the full operation of services,” says the operator, adding that “it will continue to monitor carefully the stability of the network and eventual residual impacts of registered energy failure.”

It adds us that the blackout verified on Monday, which left the country several hours without electricity, “was a real test to the resilience of infrastructure, systems” and their teams, demonstrating the operator’s ability to respond “in extreme scenarios.”

A widespread cut in electric supply affected on Monday, since 11:30, Portugal and Spain, a situation that continues without explanation by the authorities. Closed airports, traffic congestion and traffic in large cities were some of the consequences of blackout.

The restoration of energy has taken place gradually throughout the day, starting with the center of the country.

source

You may also like

Our Company

News USA and Northern BC: current events, analysis, and key topics of the day. Stay informed about the most important news and events in the region

Latest News

@2024 – All Right Reserved LNG in Northern BC