It is one of the world’s largest and most technically demanding projects in the electricity area: the supply of part of Singapore with electrical energy from a huge solar park in northern Australia. After the operators on and off, the mega project, albeit late, is to be able to finally be able to realize the mega project. Instead of 2029 as originally intended, the first electricity from Northern Territory, where the Uluru, formerly Ayers Rock, is also one of the landmarks of Australia, will flow into the Southeast Asian city state. Estimated costs: the equivalent of a good 20 billion euros.