To President from Petrobras, Magda Chambriardbelieves the company is “close to a consensus” for the license of exploiting the Foz do Amazonas.
“Our perspective is that the 12th is decisive to establish the conditions and date for pre-operational authorization (APO). I have already talked to the president of Ibama, who is aware of everything we are presenting, of all operational conditions,” he said.
“We are offering the largest and best individual emergency plan that has ever seen in the deep -wate oil industry in the world,” he added, reiterating that APO has no date yet.
As Estadão/Broadcast has already shown, the delay in marking Ibama for Petrobras to explore the Morpho well, in the Fza-M-59 block, in the Foz do Amazonas basin, Brazilian equatorial margin, has caused dissatisfaction in the state.
The company disburses more than $ 4 million a day to keep the ODN II probe ready to operate.
The executive spoke to the press during the event “their energy: female empowerment in institutions”, organized by Petrobras to discuss gender equity in public and private institutions and promote the exchange of experiences about the role of women in leadership positions.
BP Discovery
Asked if there is a possibility of an agreement with BP (British Petroleum) regarding the Boomerang field, in the pre-salt of the Santos Basin, the president of Petrobras stressed that any decision will depend “on what the area will actually represent”.
A
The well has a reservoir about 500 meters below the top of the structure and penetrated a column of raw hydrocarbons estimated at 500 meters in a high quality pre-salt carbonate reservoir with a sand extension of over 300 square kilometers.
The company will begin laboratory analysis to better characterize the reservoir and the discovered fluids, which will provide additional information about the potential of the boomerang block. The analyzes already done indicate high levels of carbon dioxide.
“We are pleased with the assets we already have. Now, if there is real and good possibility, in the range of attractiveness that Brazil wants, the doors are not closed for this project and none,” said Magda.