Sponsored by Mining Vale, for an unprecedented show on September 17, broadcast live throughout Brazil from a floating stage built over the Guamá River in Belém (PA).
In the form of Victoria-Régia, it will be of steel and will weigh 90 tons. For its production, it will need 135 tons of iron ore. The values involved in production were not revealed.
Only the scenography has 13.2 tons of steel, 10 tons dedicated to the stage sheet, 1.2 tonne to the nucleus and 2 tons to the technical composition.
To move and position this floating structure, you will still need a ferry of 80 tons.
Asked, the organization of the event stated that it obtained all environmental licenses and that, after the show, the entire metal structure will be reused.
Com Stéfanie Rigamonti
Gift Link: Did you like this text? Subscriber can release seven free hits from any link per day. Just click on F Blue below.
Your signature can be further
Do you already know the advantages of being a subscriber of Folha? In addition to having access to reports and columns, you have exclusive newsletters (). You can also download our free app from or to receive alerts from the main news of the day. Your signature helps us do independent and quality journalism. Thanks!
Your signature is worth a lot
More than 180 reports and analyzes published every day. A team with over 200 columnists and bloggers. Professional journalism that supervises the government, conveys profitable and inspiring news, opposes the intolerance of social networks and traces a clear line between truth and lie. How much does it cost to help produce this content?